The Material Handling Blog

Read More Articles

10 Common Warehousing Mistakes to Avoid This Year

December 28, 2017
Constraints such as omni-channel distribution and speed to delivery have really put a strain on overall operations.  Given the immense challenges faced today, DC managers and facility engineers should work to avoid the following 10 common warehousing mistakes.

A Review of the Distribution Automation Landscape in Mexico

June 16, 2017
We all know and believe that automation is the future (and in some cases, the present), but what’s different for Mexico and LATAM (Latin America) in general? Why is it so difficult to take that first step to automate material handling processes in those countries?

5 Passos para uma Implementação de Automação Logística bem Sucedida

December 09, 2016
O sucesso de uma solução de manuseio de materiais bem implementada depende de alguns passos importantes a seguir. Um bom manuseamento de materiais integrador siga estes passos para garantir que o projeto for bem sucedido, e que o cliente está satisfeito. Rear o artigo completo

Get the MOST from Your Workforce

November 19, 2015
Do you or any of your clients have processes where employees’ expected rates are unknown, based on averages, or quite frankly conjectured from guessing? Rates may be unknown or need re-evaluation because of new or different layouts, or process changes. If any of these situations are affecting your employee production rates, then you should consider MOST, Maynard Operation Sequence Technique.

How to Create a Better Warehouse Layout

August 20, 2014
It is important that a warehouse has enough space to operate efficiently. However, it may be even more important that the space is laid out in a way that optimizes the warehouse’s abilities. Here is a 4-step process used by our consulting team to create the best facility layout.

The Final Step in the DMADV Decision Making Process: Validation

July 30, 2014
For several weeks, we have discussed the DMADV process for decision making. The first four (4) phases (Definition, Measurement, Analysis and Design) have been completed, so now we need to consider the effectiveness of the design(s) through a validation process, our 5th and final phase.

Design: Step 4 in the DMADV Process for Supply Chain Improvement

July 16, 2014
In this article, we continue our review of the DMADV 5-step process for improving your supply chain. Design is step four in the process and involves leveraging the criteria, characteristics and flows developed in the “Analysis” step to look at alternative designs and technologies to create the best facility layout.

Analyze: Step 3 in the DMADV Process to Improve Your Supply Chain

June 30, 2014
In previous editions of this article series the Define and Measure stages of the Five Step Decision Making Process (DMADV) to drive supply chain improvements were discussed paving the way for step 3 - Analyze. During this step, the overall performance of the system is evaluated using statistical models to analyze transactional and inventory data.

Measure: Step 2 in the DMADV Process to Improve Your Supply Chain

June 05, 2014
DMADV stands for: Define, Measure, Analyze, Design, and Validate. It is a problem-solving approach used by our consultants to help customers make the best decisions for their warehouse and ultimately their supply chain. We've reviewed step 1, but here's more information on step 2: Measure.

Defining the Problem: Step 1 in the 5-Step Decision Making Process to Improve Your Supply Chain

May 22, 2014
In a previous article, we started the discussion on the 5-step decision making process, DMADV, and how it helps you make better decisions in your supply chain or any area of your business. In a series of articles, we’ll further explore and define each step so you can get the most out of this process. In today's article, step 1... Read: Step 1 - Defining the Problem

Pick To Light (PTL) vs. Pick To Voice (PTV)

November 13, 2009
Supply Chain Consultant Marvin Logan debates which is better: Pick-to-Light or Pick-to-Voice.
Posted in System Automation
Results: 35 Blog Posts found.

Archives

Latest Case Study

 

20220224-DENSO-Toyota-Core-tow-tractor-tugger-agv-autonomous-vehicle-automotive-distribution-loading-pallet-transfer-cart_3

Denso

Learn how AGVs helped Denso achieve a 48% reduction in process defects and 33% reallocated labor to better positions with no eliminated roles. 

 

Close